Some of the cork is down.
|
All of the base level cork is down.
|
The Middle level base is constructed.
|

|

|

|
|
Cork is partially put down on the middle level.
|
Most of the cork is down on the middle level.
|
The Upper portion of the layout now has it's base.
|

|

|

|
|
Time to create the removeable mountain.
|
But then it occured to me that I had to lay the track on the lower level before doing scenery and the upper layer is totally secured.
|
Now the layout is regraded and almost all corked.
|

|

|

|
|
It is now all corked and there are bridges.
|
This is the main, cooler, bridge.
|
More track laying complete (including the crossover near the upper reverse loop.
|

|

|

|
|
The other, less interesting bridge.
|
All the track is layed. Manual throwbars for switches still to be installed.
|
The $70 control board. (that's how much all the SPDT and DPDT switches cost from Radio Shack.)
|