Creating an N Gauge Layout




Some of the cork is down. All of the base level cork is down. The Middle level base is constructed.



Cork is partially put down on the middle level. Most of the cork is down on the middle level. The Upper portion of the layout now has it's base.



Time to create the removeable mountain. But then it occured to me that I had to lay the track on the lower level before doing scenery and the upper layer is totally secured. Now the layout is regraded and almost all corked.



It is now all corked and there are bridges. This is the main, cooler, bridge. More track laying complete (including the crossover near the upper reverse loop.



The other, less interesting bridge. All the track is layed. Manual throwbars for switches still to be installed. The $70 control board. (that's how much all the SPDT and DPDT switches cost from Radio Shack.)

Right click on the above pictures to Save As… or open with an external jpeg viewer.

back to picture page

back to main page