|
This is the layout as it was before refurbishing. The grade transitions weren't smooth at all.
|
The new layout approximately 85% done as far as trackwork goes. The base is now polystyrene insulation foam. Good ole Dow R3 residential stuff.
|
It's about $12 a 4x8 sheet of 3/4" and is really easy to form scenery with.
|